Clam Shelter – MATES Storage Facility High Tension Fabric Structures
Fort Carson, Colorado

Mass supplied and erected two high tension fabric structures at Fort Carson. Each structure is 90' by 152'. Mass was responsible for bringing electrical service to the site. Hi-Bay Fixtures, CO2 Detectors, and 3 phase welding outlets were installed. In addition Mass provided the water line and propane service to the structures. Infrared heaters were installed. The buildings have large rolling doors along with man doors. A chain link security fence enclosing the structures was also installed. This project was mission critical and was completed in 32 working days.